Fly across the project areas and explore how compute, growing and energy infrastructure could fit the ground beneath them.
Illustrative concept: northern solar opportunity; source Plan B massing; power configuration requires study
Four source-dimension halls; illustrative registration; reserved power land remains land
Owner-revised Zone 1; source removals and 50% southwest footprint-area reduction retained
Package A; proposed planting; electrical yard is a substation, not a generating plant
Native Mac V1 geographic preview; V2 production assets are separate; proposed thermal network